top of page

AKG vitre
AKG vitre
Quality Control and Deviation Analysis
Client: Steel Fabricator and Erector
Client Need: Ensure that the curtain wall geometry complies with the tolerance requirements for glass panel installation
Work Performed: Control point layout and 3D scanning of the curtain wall prior to glass panel installation
Deliverable: Detailed and certified report
Benefit: Prevents additional costs and delays during the installation of glass panels
bottom of page